Key takeaways
- Sales and use tax exemptions on equipment are often the most valuable incentive over time, and their statewide cost is large: an April 2025 study found at least 10 states each giving up more than $100 million a year.1
- Property tax relief is usually local and negotiated, through abatements or PILOT agreements such as Georgia’s bond-for-title structure.2
- Qualifying criteria typically include minimum investment, jobs, wages and deadlines; Virginia’s program, for example, requires $150 million of new investment and 50 new jobs at 1.5 times the local average wage.5
- Program risk is real: Ohio paused new data center exemption approvals in 2026, and Georgia lawmakers filed bills that year to end that state’s exemption early.36
- Clawbacks, sunset dates and reporting duties are as important as the headline benefit.
- Incentives can tip a decision between good sites, but they cannot fix a site without power.
01Why tax treatment matters so much for data centers
A data center is capital-intensive in a way that most buildings are not. The building and land are only part of the investment. Electrical and mechanical systems, and especially the IT equipment inside, account for much of the cost, and servers and network gear are refreshed on short cycles. Each refresh can be a new taxable purchase. Over the life of a campus, the total spent on equipment can exceed the cost of the buildings by a wide margin.
That is why the tax treatment of equipment purchases, equipment held as business personal property and electricity use can drive long-term operating cost differences between states and between counties. The amounts are large from the state’s side too. Virginia’s Joint Legislative Audit and Review Commission (JLARC) estimated the state’s data center sales and use tax exemption was worth about $928 million to the industry in fiscal 2023, and about 90% of the state’s data center industry was using it.7 An April 2025 Good Jobs First study found that states were losing more than $3 billion a year to data center exemptions.1 Incentives do not replace the fundamentals of power, fiber, land and entitlement, but between two otherwise comparable sites they often decide the outcome. The trade-off is explored in tax incentives vs. power costs.
Fig. 1Reported cost of two state exemptions
- Virginia, FY2023$0.93B
- Georgia, FY2026 projected$2.5B
billion USD per year
02The main types of data center incentives
| Incentive | Who grants it | What it reduces | Notes |
|---|---|---|---|
| Sales and use tax exemption on equipment | State, by statute | Tax on servers, networking and, in some states, cooling, electrical and backup power equipment | Often the largest long-term benefit because of refresh cycles |
| Sales tax exemption on electricity | State | Tax on power purchased for operations | Not available everywhere; some states do not tax electricity sales at all |
| Property tax abatement | County, city or other local taxing body, under state authority | Real property tax, personal property tax or both, for a set term | Often phased or partial; school district treatment varies |
| PILOT agreement | Local development authority or taxing bodies | Replaces standard property tax with negotiated payments | Payments can be fixed, scheduled or tied to value |
| Business personal property tax treatment | State law, sometimes local option | Tax on equipment held on site | Some states exempt or reduce it; others tax it fully, which can make it a major local revenue source |
| Income or franchise tax credits | State | Corporate tax liability | Less useful if the operating entity has little in-state income |
| Enterprise zones, opportunity zones and TIF | State or local | Varies; may fund infrastructure | Location-specific; layered with other programs |
| Infrastructure grants or cost-sharing | State or local | Cost of roads, water, sewer or site work | Usually discretionary and negotiated |
Sales and use tax exemptions
These are usually set in state statute and apply to qualifying equipment purchased for use at a qualifying data center. The definition of qualifying equipment matters: some programs cover only computer equipment, while others include electrical systems, cooling, generators, UPS systems, software and even construction materials. Virginia’s exemption, for instance, covers computer equipment necessary and essential to operating a qualifying data center and does not reach general building improvements or fixtures.5 Some programs exempt only the initial build; others cover replacement equipment for the life of the program. Minnesota’s 2025 law lets qualified facilities claim the exemption for 35 years after the first qualifying purchase, up from 20.8 State-by-state detail is in data center sales tax exemptions by state.
Property tax abatements and PILOTs
Property tax relief is usually local, even when state law authorizes it. A county or development authority may abate a share of taxes for a term of years, or hold title to the property and lease it back to the operator under a PILOT agreement that sets negotiated payments in place of standard taxes. In Georgia’s common bond-for-title structure, the owner conveys the project to a development authority in exchange for bonds, leases it back with a purchase option, and pays rent that covers the bond debt service; the tax savings are negotiated, not automatic.2 Reported terms vary widely. Under one 2026 Effingham County, Georgia agreement, the campus makes annual payments equal to the tax on 50% of its appraised value at the 2026 tax rate for 15 years, then returns to the tax digest.9 In a 2026 Columbia County, Georgia deal, local reporting noted that the bonds are the company’s obligation and non-recourse to the authority and the county.10
Fig. 2How a bond-for-title PILOT usually works
- 01
Authority issues bonds
Development authority issues bonds for the project.
- 02
Title transfers
Authority holds title, so the property leaves the tax digest.
- 03
Lease-back
Company leases the project with an option to buy.
- 04
Rent and PILOT
Rent covers debt service; PILOT payments replace taxes.
- 05
Return to tax rolls
At term end the company buys back title and pays full tax.
The structure affects which taxing bodies, including school districts, receive revenue, and that is often what local officials and residents focus on. Our guide to property taxes on data center projects covers assessment in more depth.
03What qualifying criteria usually look like
Programs differ in their numbers, but most use some combination of the same requirements:
- Minimum capital investment, measured over a set period from the start of construction. Some programs set lower thresholds in rural or economically distressed areas; Virginia lowers its job requirement from 50 to 25 in localities with high unemployment or in enterprise zones.11
- Minimum new jobs, often full-time positions located at the facility.
- Wage requirements, typically tied to a share of the county or state average wage, and sometimes health benefit requirements.
- Deadlines for reaching investment and job targets, and for applying before construction or purchases begin.
- Facility definitions, such as minimum size, use primarily for data processing, or ownership and tenancy rules that affect colocation operators and their customers.
- Approval by a state agency or local body, often through an application and a formal agreement, before benefits apply. In Virginia, a memorandum of understanding with the Virginia Economic Development Partnership comes first.11
- Ongoing reporting of investment, employment and wages for the life of the benefit.
Fig. 3Virginia’s data center exemption thresholds
- minimum new capital investment
- $150M
- new jobs (25 in qualifying localities)
- 50
- the local prevailing average wage
- 1.5×
For colocation facilities, check whether tenants who own their own servers can use the exemption on their equipment purchases. Programs handle multi-tenant facilities differently, and the answer affects how valuable the facility is to its customers.
04The fine print: clawbacks, sunsets and changes
The headline benefit is only part of the picture. Before relying on an incentive, review:
- Clawbacks. Many programs require repayment of some or all benefits if investment, job or wage targets are not met or maintained.
- Sunset dates. Programs may expire or close to new applicants unless the legislature extends them. Virginia’s exemption runs through June 30, 2035, with extensions to 2040 and 2050 for operators that meet higher thresholds.12
- Legislative and executive change. States revisit data center incentives as their fiscal effect grows. Some attach new conditions, as Minnesota did in 2025 by requiring prevailing wages to build qualified large-scale data centers; others pause or end new approvals.84
- Timing. Many benefits require approval before construction begins or before equipment is purchased. Purchases made earlier may not qualify.
- Local approval. Abatements and PILOTs often need a public vote, which brings the incentive into the community conversation.
Recent history shows how quickly terms can move. Georgia’s legislature passed a bill in 2024 to suspend that state’s exemption for two years; Governor Kemp vetoed it, noting the exemptions had recently been extended through 2031.13 In 2026, a Georgia bill to end the exemption in 2027 did not reach a Senate vote, even as the state projected about $2.5 billion in lost state and local revenue for fiscal 2026.6 Ohio’s governor directed the state Tax Credit Authority in May 2026 to stop considering new data center exemption requests during a legislative study, while leaving approved exemptions in place.3 Illinois’s governor directed a pause in processing new Data Center Investment Program agreements beginning July 1, 2026.4 Virginia kept its exemption in the 2026 budget but added a temporary tax on data center electricity use, with collections capped at $600 million a year,14 and a legislative subcommittee is due to report on data center taxation by December 15, 2026.12 The broader pattern is tracked in state data center legislation trends.
Return-on-investment findings cut both ways, which is part of why the debate continues. A 2026 Cardinal News analysis of Virginia’s audit work reported that the state recovers about 48 cents in other tax revenue for every dollar of exemption, and that the work credited the exemption with more jobs per dollar than any incentive except grants.15 Those numbers are what legislators will be looking at when programs come up for renewal.
05How incentives fit into site selection
Incentives work best as a filter between sites that already pass on power, fiber, land and entitlement. Experienced site selectors usually narrow the search on fundamentals first, then compare tax treatment across the remaining states and counties. Starting with incentives tends to produce shortlists of sites that cannot get power in time. The broader framework is in data center site selection criteria.
Incentives also affect community engagement. If residents see the project mainly as an exemption from taxes their neighbors pay, opposition grows. Being clear about how much revenue the community keeps, as discussed in community engagement for data centers, is part of making the incentive hold up politically. Local revenue can be substantial: Loudoun County, Virginia, says data center revenue has let it cut the personal property tax rate on vehicles beginning in tax year 2026 and eliminate its $25 vehicle license fee.16
06What to check for a specific site
- 01Which state programs apply to data centers, and are they open to new applicants today, or paused?
- 02What investment, job and wage thresholds apply in this specific county?
- 03What equipment qualifies, and does it include replacement equipment and tenant-owned equipment?
- 04How is business personal property taxed, and is there relief available?
- 05What local abatement or PILOT authority exists, and has it been used for data centers before?
- 06What are the clawback terms, reporting duties and program expiration dates?
- 07Does any approval have to occur before construction or purchases begin?
- 08Is legislation pending that would change the program before the project’s equipment purchases begin?
Tax counsel and incentive advisors confirm the details. During screening, the goal is to know which sites have a realistic incentive path and roughly how it compares across the shortlist, so it can be weighed in the data center feasibility study. If you want that comparison on a shortlist, you can get a site reviewed.
Common questions
What tax incentives are available for data centers?
The most common are state sales and use tax exemptions on data center equipment, sales tax exemptions on electricity, local property tax abatements, payment-in-lieu-of-tax (PILOT) agreements, and favorable treatment of business personal property.1 Some states and localities also offer income tax credits, enterprise zone benefits, tax increment financing or infrastructure grants. Availability and terms vary widely by state and county, and several states paused new approvals or debated limits in 2026.4
What is a PILOT agreement for a data center?
A payment-in-lieu-of-taxes agreement replaces standard property taxes with negotiated payments for a set term. Often a local development authority holds title to the property and leases it to the operator, which takes the property off the regular tax digest.2 The operator then makes agreed payments that may be fixed, scheduled to rise over time or tied to investment or value, and those payments are shared among local taxing bodies.
How do data centers qualify for sales tax exemptions?
Most programs require a minimum capital investment within a set period, a minimum number of new jobs, and wages at or above a benchmark tied to local or state averages; Virginia’s base test is $150 million, 50 jobs and 1.5 times the local average wage.5 Many require an application or agreement before purchases begin, then ongoing reporting. Failing to meet or maintain the targets can trigger clawbacks of benefits already received.
Are data center tax incentives being repealed?
Some are being paused or narrowed. Ohio stopped accepting new data center exemption requests after June 1, 2026, and Illinois’s governor directed a pause on new program agreements from July 1, 2026.34 Minnesota ended the electricity sales tax exemption for data centers in 2025 while extending its equipment exemption.8 Check program status at the time of purchase, not just at site selection.
Should tax incentives drive data center site selection?
Usually not on their own. Power availability, fiber, land, water and entitlement determine whether a site can be built at all and on what schedule. Incentives are most useful for comparing sites that already pass those tests, where differences in long-term equipment and property tax treatment can be significant. A large incentive at a site without timely power has little practical value.
Notes
- 1.Bloomberg Government, “State Losses From Data Center Tax Breaks Top $3 Billion Annually,” 2025. news.bgov.com
- 2.Carl Vinson Institute of Government, University of Georgia, “Tax Abatements,” n.d. cviog.uga.edu
- 3.WTAP, “Gov. DeWine directs pause on data center tax exemptions during legislative study,” 2026. wtap.com
- 4.Venable LLP, “Data Center Tax Incentives Under Pressure as States Reassess Costs and Infrastructure Impacts,” 2026. venable.com
- 5.Virginia Department of Taxation, “Ruling of the Tax Commissioner, P.D. 23-92,” 2023. tax.virginia.gov
- 6.Inside Climate News, “Bills to Protect Ratepayers From Data Centers Fail in Georgia Legislature,” 2026. insideclimatenews.org
- 7.Virginia Mercury, “The exemption Virginia can’t price and won’t stop,” 2026. virginiamercury.com
- 8.Minnesota House of Representatives, “Session Daily: New Laws 2025, Data Centers,” 2025. house.mn.gov
- 9.The Atlanta Journal-Constitution, “OpenAI in Georgia: how $20B data center plan secretly took root in Effingham,” 2026. ajc.com
- 10.WRDW, “Columbia County advances $17 billion data center deal,” 2026. wrdw.com
- 11.Virginia Economic Development Partnership, “Data Center Sales and Use Tax,” 2018. vedp.org
- 12.George Mason University, Center for Regional Analysis, “STEP Brief 05: Data Centers,” 2026. care.gmu.edu
- 13.Capitol Beat, “Kemp vetoes bill suspending data centers tax break,” 2024. capitol-beat.org
- 14.Bisnow, “Virginia Budget Keeps Data Center Tax Breaks, Adds $600M Energy Levy,” 2026. bisnow.com
- 15.Cardinal News, “A state study found that data center tax break was Virginia’s 2nd best incentive, producing $6.1 of labor income for every $1 in exemptions,” 2026. cardinalnews.org
- 16.Loudoun County, Virginia, “Data Centers: Tax Revenues & County Budget,” n.d. loudoun.gov
Have a site in mind?
Get a straight answer on your land.
Send a parcel number, an address, a map pin or a target load. We’ll tell you what it can support and what it would take.
This guide is general information about data center site selection. It is not engineering, legal, tax or investment advice. Requirements vary by state, utility and county, so confirm the specifics for any site with the relevant authorities and advisors.
Terms in this guide
Related guides
More in Zoning, permitting & community
- FAA Airspace, Airports and Height Limits for Data Centers
- Zoning for Data Centers: By-Right, Special Use and Rezoning
- The Data Center Permitting Process, Step by Step
- Noise, Setbacks and Buffers for Data Centers
- Development Agreements for Data Center Projects: What They Cover
- Annexation, Jurisdiction and Utility Service Areas for Data Center Sites
- Data Center Moratoriums and Local Restrictions: How to Screen for Them
- Site Plan Review for Data Centers: What It Covers and How Long It Takes
- Building and Fire Codes for Data Centers: IBC, NFPA 75 and 76, NFPA 855
- Public Hearings for Data Center Projects: Notice, Testimony and How to Prepare
- Comprehensive Plans and Future Land Use Maps for Data Center Sites
- Data Center Zoning Ordinances and Overlay Districts: Recent Rules and Standards
- Traffic Impact Studies for Data Centers: Trip Generation, Construction Traffic and Road Improvements
- Impact Fees and Utility Connection Fees for Data Centers: How They Work and What Is Negotiable
- Contested Data Center Projects: Lessons From Prince William, Peculiar, Tucson and Other Public Fights
- Data Center Architectural and Visual Standards: Facades, Screening, Lighting and Height
Guide 5 of 20 in Zoning, permitting & community · all 242 guides · glossary · calculators