A BlackForge Ventures company
BlackForge Data Centers

For developers & site selectors

Screen your development pipeline before you commit.

Review individual sites or a portfolio against the same infrastructure, ground and entitlement constraints. See which parcels deserve further diligence, which need verification and which should be ruled out.

01

Start with the sites and the decision.

Send the locations or parcel identifiers you already have, along with the load, timeline and decision criteria. The screen should answer the question your team is facing.

Inputs

  • Parcel identifiers, addresses or map links.
  • Portfolio size and geographic scope.
  • Target load and development timeline.
  • Known constraints.
  • The acquisition, diligence or prioritization decision being evaluated.

02

Separate screening from verification.

Apply consistent infrastructure and site constraints across the pipeline. Then identify what still needs utility, site-specific or professional verification before a parcel can advance.

How each parcel is classified. These describe the decision framework, not results from a real portfolio.

  • Advance

    Warrants further diligence based on the screen.

  • Verify

    Has an unresolved condition affecting suitability.

  • Exclude

    Fails a stated requirement, with the reason documented.

03

Put the findings into your workflow.

Use the results to prioritize diligence and communicate the reasoning downstream. Available formats include ranked results, reports, searchable maps and data exports, as agreed in the scope.

Outputs

  • Consistent parcel rankings.
  • Documented exclusions and constraints.
  • Sourced findings.
  • Outstanding verification items.
  • Next steps for the sites that advance.

Watch · Screening at scale

Thousands of parcels in. The few worth buying out.

How a screen runs every parcel through the same constraints, rules out the rest with a reason, and ranks what’s left by the largest data center each one could hold.

Read the transcript

If your team evaluates land for data centers, you already know the math problem. Too many parcels, too few that can actually get power, and diligence that costs the same whether a site is great or dead on arrival. Most deals die on power, and they die late, after the deposits and studies are paid.

A screen flips the order. Rule out the many cheaply. Spend your diligence budget only on the few.

Send us your list in whatever shape it's in: APNs, addresses, KMZ files, shapefiles or a spreadsheet. Or just give us a target load and regions. Every parcel runs through the same 14 constraints, from transmission capacity and substation distance to floodplain, zoning and room to phase.

A site has to pass all of them, not most. Then the survivors get what the data can't show: utility positions, access and conditions on the ground. You get every parcel ranked by the size of data center it could support, with the reasons behind every call.

Results can also be delivered on a live map, as data exports, or as full reports on your finalists. We've screened more than 17 million parcels, including nearly 500,000 acres in a single engagement for one of the largest landowners in the country. Every screen is scoped to your list, for one fixed fee in writing.

Tell us what you're screening, and a real person will reply within one business day.

Walkthrough · Illustrative sample, not real parcels · Captions available

How the work runs

Screen, verify, assemble, position.

  1. 01

    Screen

    Apply infrastructure and ground constraints to identify candidates.

  2. 02

    Verify

    Investigate the capacity, timing, access and site conditions that maps alone cannot establish.

  3. 03

    Assemble

    Identify adjoining parcels where the engagement requires a combined site.

  4. 04

    Position

    Document the reasoning and findings in the agreed format.

Read the methodology

Questions

Can we send a large list of parcels?
Yes. BlackForge describes portfolio screening at scale. Provide the parcel locations or identifiers and the criteria the screen needs to apply.
Does passing a screen mean a site is ready to build?
No. Screening identifies the sites worth advancing and the conditions that still need verification. It does not replace the required utility, engineering or permitting work.
Can we search for new sites instead of reviewing an existing portfolio?
Yes. Use “Find a development site” to start with the project requirements rather than a parcel list.

Read and run the numbers

Not you?

Know where to spend the next diligence dollar.

Bring the pipeline, target load and decision criteria. Start with a clearly scoped screen.

Scope my portfolio screen