How far can the sites be apart?

Set the distance, how much the fiber wanders and your latency budget. Watch light make the round trip and see how far the budget reaches.

Route
miles
×

Fiber follows roads, rails and rights-of-way, so it runs longer than the map line.

ms

Switching, routing and amplification added to the round trip.

Your budget
ms

What the workload can tolerate. Set it from the application, not a rule of thumb.

Light in fiber
SITE ASITE B60 MI STRAIGHT LINE84 MI OF FIBER
Result

Round trip

1.52ms

Inside your budget

One way, fiber only

0.66ms

84 fiber miles

Budget reaches

217miles

Straight-line, at this route factor

0 msBudget 5.0 ms

For early planning only. Results follow from the inputs and the stated assumptions; they are not engineering, financial or legal advice.

How the math works

01

Light in glass

Light in optical fiber travels at roughly two-thirds of its speed in a vacuum, about 204,000 km a second, or about 4.9 microseconds per kilometer one way.
02

Map distance to fiber distance

Fiber follows roads, railways and rights-of-way, so the cable route runs longer than the straight line. The route factor multiplies the map distance to estimate fiber miles; the real route comes from the carrier.
03

Round trip and budget

Round-trip latency is twice the one-way fiber time plus the equipment overhead you enter. The reach figure inverts the same math to show the farthest straight-line distance that fits your budget.

Questions

How much latency does fiber add per mile?

About 7.9 microseconds per fiber mile one way, or about 15.8 microseconds round trip, before switching and routing.

What is a route factor?

The ratio of the actual fiber route length to the straight-line distance between two points. Fiber rarely runs in a straight line, so the factor is above 1.

What latency budget should I use?

One set by the application: synchronous storage replication, trading systems and interactive workloads each have their own limits. This calculator does not assume one.

Why is my measured latency higher?

Real networks add queuing, routing detours, protocol overhead and congestion. Treat this as the physical floor.