Latency

Latency is the time it takes data to travel between two points on a network, usually measured in milliseconds round trip. In fiber, light travels roughly five microseconds per kilometer one way, so route distance, not straight-line distance, sets the floor. Latency matters most for edge, colocation and interactive workloads, and less for training or batch workloads that can sit far from users.

The full guide · Decisions and trade-offsNear the Metro or Near the Power? Choosing a Data Center LocationHow to weigh a data center site near a metro market against a remote site with abundant power: latency, fiber, labor, land, entitlement, water and timing.