Gas lateral

A gas lateral is a pipeline branch that carries natural gas from a transmission pipeline or local distribution main to a specific customer site. Data centers planning on-site generation or bridge power often need a dedicated lateral sized for their peak fuel use. Its route, required easements, pressure, metering and who pays for construction are key questions when evaluating gas access.

The full guide · Water, gas & fiberNatural Gas Pipeline Access for Data Center SitesWhat natural gas access a data center site needs for on-site power: pipeline types, firm capacity, taps and laterals, contracts and easements that limit layout.