Bridge power

Bridge power is temporary on-site generation that serves a data center until permanent utility service is available. It lets a developer energize early phases while transmission upgrades or a new substation are still being built. Common sources are gas reciprocating engines, turbines or mobile units. Bridge power still needs fuel supply, air permits and an exit plan for when the grid connection arrives.

The full guide · Decisions and trade-offsGrid Power vs. On-Site Generation: How to DecideHow to choose between utility grid service and on-site generation for a data center, comparing timing, cost exposure, reliability, permits, fuel and land.