Ramp schedule
A ramp schedule is the planned timeline showing how a data center’s electric demand grows from first energization to full load, usually stated in MW by year or quarter. Utilities use it to plan substations, transmission upgrades and generation. A realistic ramp schedule can speed service for early phases, and it often becomes part of the electric service agreement and its minimum bill terms.
The full guide · Power & interconnectionLoad Ramp Schedules: How to Phase Power for a Data Center CampusWhat a data center load ramp schedule is, how utilities use it, how to build a realistic one, and why an overstated ramp can cost a project money and time.Where Ramp schedule comes up
- Guides by roleSite Selection for Data Center Developers: What to Answer, in Order
- Guides by roleLarge Data Center Loads: What Utilities and Co-ops Look For
- Power & interconnectionWhat Is a Utility Load Study for a Data Center?
- Power & interconnectionHow Much Power Does a Data Center Need?
- Power & interconnectionWhat Is Powered Land?
- Decisions and trade-offsOne Large Data Center Campus vs. Several Smaller Sites
- Guides by roleSite Risk for Data Center Investors and Lenders
- Power & interconnectionFrom Signed Agreement to Energization: The Data Center Power Timeline