Rack density

Rack density is the amount of power drawn by the IT equipment in a single server rack, usually stated in kilowatts per rack. Higher densities pack more computing into less floor area but concentrate heat, often requiring liquid cooling. For site planning, density affects building size, cooling method and water needs, though total campus power, not floor area, usually remains the main constraint.