Transformer

A transformer is electrical equipment that raises or lowers voltage by electromagnetic induction. Large power transformers step transmission voltage down at a data center substation, and smaller units step it down again inside the campus. High-voltage power transformers are custom-built and can have long manufacturing lead times, so their availability often affects energization schedules.

The full guide · Power & interconnectionSubstation Proximity and Capacity for Data Center SitesHow substation distance, type and available capacity affect a data center site, what “available capacity” really means, and how to check it before you commit.