Calculator 06 · Density

How much IT fits in the building?

Set the floor area, white space share, area per rack and rack density. See the racks, the megawatts and the floorplate heat up.

The building
sq ft
%

Share of floor area that holds racks; the rest is electrical, mechanical and support.

sq ft

The rack plus its share of aisles inside the white space.

Density
kW
Floorplate
ELECTRICAL& MECHANICALWHITE SPACE 50%EACH CELL ≈ 18 RACKS
2 kW200 kW per rack
Result

Critical IT load

62MW

4,166 racks at 15 kW

Facility demand

81MW

At PUE 1.30

Density

500W/sq ft

Of white space

For early planning only. Results follow from the inputs and the stated assumptions; they are not engineering, financial or legal advice.

How the math works

01

Racks from floor area

White space is the share of the building floor area that holds IT racks; the rest goes to electrical rooms, mechanical plant and support. Dividing white space by the floor area per rack (the rack plus its share of aisles) gives the rack count.
02

IT load = racks × kW per rack

Multiplying the rack count by the average power per rack gives the critical IT load. The density presets are illustrative points from legacy enterprise rooms to liquid-cooled AI racks.
03

Facility demand and density

Facility demand is the IT load times PUE. Watts per square foot divides IT power by white space area, which is how many electrical and cooling designs are first sized.

Questions

How many racks fit in a data center?

At 50% white space and 30 square feet per rack, a 250,000-square-foot building holds about 4,170 racks. Higher-density racks need more space per rack for cooling, so the area per rack often rises with density.

What is white space?

The raised-floor or slab area where IT racks sit, as opposed to gray space for electrical, mechanical and support functions.

Why does rack density matter for site selection?

It sets how much power a given building needs. The same building at 120 kW per rack can need many times the power of one at 6 kW, which changes the utility request, the substation and the cooling plant.

Is the floorplate drawing my layout?

No. It shows the white space share and rack rows, tinted by density, with each cell standing for a group of racks.