Critical IT load

Critical IT load is the electrical power drawn by the computing, storage and network equipment a data center exists to run, excluding cooling, lighting and other facility loads. Capacity is often marketed in MW of critical IT load, while the utility sizes service to total facility demand, which is higher. Always confirm which figure a quoted megawatt number refers to before comparing sites.