ASHRAE TC 9.9

ASHRAE TC 9.9 is the technical committee of ASHRAE that covers mission-critical facilities, data centers and electronic equipment, and it publishes the widely used thermal guidelines for data processing environments. The guidelines define recommended and allowable temperature and humidity ranges by equipment class. Wider allowable ranges let designers use more outside-air or economizer hours, which affects how a site’s climate translates into cooling energy and water use.