A BlackForge Ventures company
BlackForge Data Centers

Facilities

Liquid cooling (direct-to-chip and immersion)

Liquid cooling removes heat from IT equipment with a fluid rather than air alone, allowing much higher rack densities. Direct-to-chip cooling pumps coolant through cold plates attached to processors, while immersion cooling submerges servers in a dielectric fluid. Both change building design, floor loading and heat rejection, and they can lower water use when paired with closed-loop systems and dry coolers.

The full guide · Water, gas & fiberAir vs. Liquid Cooling: What Each Needs From a SiteHow air and liquid cooling change what a data center needs from its site: power per acre, water, mechanical yard space, structure, noise and climate exposure.

Where Liquid cooling comes up

Have a site in mind?

Get a straight answer on your land.

Send a parcel number, an address, a map pin or a target load. We’ll tell you what it can support and what it would take.

Get started