Setback and buffer

A setback is the minimum required distance between a structure, or equipment such as generators, and a property line, road or neighboring use. A buffer is an area kept as open space or landscaping, often with berms or walls, to separate a facility from neighbors. Data center codes increasingly tie both to noise and visibility, and the required distances vary by jurisdiction.

The full guide · Zoning, permitting & communityNoise, Setbacks and Buffers for Data CentersWhere data center noise comes from, how noise ordinances and setbacks are written, and how buffers, layout and sound studies affect a site’s buildable area.