SFHA (special flood hazard area)

A special flood hazard area is land that FEMA maps as subject to the 1% annual chance flood, often called the 100-year floodplain, shown on Flood Insurance Rate Maps as Zone A, AE and related zones. Zone AE is the part where FEMA has determined Base Flood Elevations. Building in an SFHA triggers floodplain permitting, elevation requirements and flood insurance requirements for federally backed loans.

The full guide · Environmental & physical riskCan You Build a Data Center in a Floodplain?How FEMA flood zones, floodways and base flood elevations affect data center sites, what it takes to build near a floodplain, and how to screen flood risk.