Geotechnical investigation

A geotechnical investigation is a study of subsurface soil, rock and groundwater conditions, usually based on borings, test pits and lab testing, that informs foundation design and earthwork. For data centers, it checks bearing capacity, shallow rock, expansive or soft soils, karst, groundwater depth and seismic site class. Findings can change grading costs, foundation types and where heavy equipment can sit.

The full guide · Environmental & physical riskSlope, Soils and Geotechnical Review for Data Center SitesHow slope, soils, bedrock, karst and groundwater affect data center sites, what a geotechnical investigation includes, and which conditions add cost or risk.