Data hall

A data hall is the room inside a data center building that holds rows of server racks, along with the cooling distribution and power distribution that serve them. Buildings usually contain several halls, each with its own electrical and mechanical support spaces nearby. Hall size and count, multiplied by rack density, drive the building footprint and the power the site must eventually deliver.

The full guide · Power & interconnectionHow Much Power Does a Data Center Need?How much power data centers need by type, from 1–10 MW edge sites to multi-gigawatt AI campuses, and how IT load, PUE and phasing shape the utility request.