Zone X (flood zone)

Zone X is a FEMA flood zone designation for areas outside the 1% annual chance floodplain. Shaded Zone X marks areas of moderate hazard, including the 0.2% annual chance or 500-year floodplain, while unshaded Zone X marks minimal flood hazard. Zone X land is generally outside federal flood insurance mandates, but local stormwater and drainage conditions still deserve review for critical facilities.

The full guide · Environmental & physical riskCan You Build a Data Center in a Floodplain?How FEMA flood zones, floodways and base flood elevations affect data center sites, what it takes to build near a floodplain, and how to screen flood risk.