Route diversity

Route diversity means having two or more fiber paths into and away from a site that follow physically separate routes, so a single cut, fire or construction accident cannot sever all connectivity. True diversity requires separate conduits, entrances and ideally separate carriers and long-haul corridors. Shared bridges, rail rights-of-way or a single road in can undermine paths that appear diverse on paper.

The full guide · Water, gas & fiberFiber Connectivity for Data Center SitesWhat fiber a data center site needs: diverse routes, long-haul and metro access, latency, lateral construction, and how to check connectivity before you buy.