Interconnection
Interconnection is the process and physical connection by which a new load or generator is joined to the electric grid. For a large data center it includes applying to the utility or grid operator, completing load and system studies, agreeing on upgrades and costs, and building the substation and lines that connect the site. It is often the longest item on a data center schedule.
The full guide · Power & interconnectionHow the Large-Load Utility Interconnection Process WorksHow large-load utility interconnection works for data centers, from the first load request through studies, agreements, financial commitments and energization.