Microgrid

A microgrid is a local group of generation, storage and loads with its own controls that can operate connected to the main grid or separately in island mode. For a data center, a microgrid might combine on-site generation, batteries and utility service to improve resilience or allow early operation. Its design affects air permits, fuel supply, interconnection terms and how utility rules treat the site.

The full guide · Power & interconnectionMicrogrids and Battery Storage at Data Center SitesWhat microgrids and battery storage do at a data center, how they change power planning, and what they need from a site in land, permits and interconnection.