Form 7460-1 and FAA Part 77

FAA Form 7460-1, the Notice of Proposed Construction or Alteration, is filed under 14 CFR Part 77 when a structure or crane would exceed certain heights, such as 200 feet above ground level, or penetrate imaginary surfaces near airports. The FAA studies the filing and issues a determination of whether the structure is a hazard. Stacks, buildings and construction cranes can all require notice.

The full guide · Zoning, permitting & communityFAA Airspace, Airports and Height Limits for Data CentersWhen a data center needs FAA review under 14 CFR Part 77, how Form 7460-1 works, and how airports, cranes, stacks and ponds affect a data center site.