Powered land
Powered land is a site where substantial electric capacity is already available or contractually committed, with a clear path to energization, rather than land that merely sits near power lines. True powered land has a utility commitment, defined MW, a timeline and a substation plan. It typically commands a premium because power is usually the longest lead item for a data center.
The full guide · Power & interconnectionWhat Is Powered Land?Powered land is property with a credible, documented path to utility power for a data center. Learn the levels of power readiness and how to verify a claim.Where Powered land comes up
- Land & site fundamentalsWhat Drives Data Center Land Value? Power, Timing, Entitlements and Size
- Guides by roleRepresenting Land for Data Center Use: A Broker’s Guide
- Markets & economicsMajor U.S. Data Center Markets: Inventory, Absorption and Power
- Markets & economicsHow Data Center Deals Are Structured: Shells, Build-to-Suits, Leases and JVs
- Power & interconnectionPower Timelines: Why “When” Matters as Much as “Where”
- Land & site fundamentalsCan My Land Host a Data Center? A Landowner’s Guide
- Feasibility, diligence & dealsHow to Screen a Land Portfolio for Data Center Potential
- Feasibility, diligence & dealsSelling or Leasing Land to a Data Center Developer