Reciprocating engine vs. combustion turbine

A reciprocating engine is a piston engine, fueled by diesel or natural gas, that drives a generator, while a combustion turbine burns fuel to spin a turbine directly. Engines are modular, start quickly and are common for backup and bridge power. Turbines offer more output per unit and suit larger continuous loads. Fuel supply, emissions, noise and redundancy drive the choice.