Data Center Site Selection in South Dakota

South Dakota offers a wind-heavy grid, with renewables supplying about 81% of in-state generation in 2024,1 and active proposals near Sioux Falls, Rapid City and in rural counties.23 Since March 2026, state law has required data centers of 10 MW or more to pay for the rate increases and infrastructure they cause and to show their water use will not overburden local supplies.45 Lawmakers rejected every sales tax incentive bill in 2026, and at least one 430 MW project was shelved as a result.56

Last reviewed · 8 min read · BlackForge Data Centers

Key takeaways

  • Wind supplied about 59% of in-state generation in 2024, a larger share than any state except Iowa, and hydropower about 21%.1
  • SB 135, signed in March 2026, makes data centers with peak demand of 10 MW or more cover the rate increases and infrastructure costs attributable to them, and preserves local ordinances.45
  • No data center sales tax refund or exemption was in effect as of October 2026: HB 1005 died 9–3 in committee and SB 234 died in the Senate.78
  • Applied Digital said its $5 billion, 430 MW Deuel County campus “doesn’t make sense at this time” after the incentives failed.6
  • Sioux Falls rezoned about 164 acres for the Gemini project next to Xcel’s Split Rock substation, a site designed for up to 500 MW.29
  • Cooperatives matter: East River Electric’s all-time peak is 864 MW, and it has fielded requests for single loads of up to 430 MW.10
Public data · Power trackerLarge-load power tracker43 utilities and their data center power rules, from public filings.

01How South Dakota compares for data center siting

South Dakota’s grid is unusually clean for the northern Plains. Wind supplied about 59% of in-state net generation in 2024, a larger share than in every state except Iowa, and hydropower from the Missouri River dams about 21%.1 Renewables overall produced about 81% of in-state generation, and natural gas, which passed coal in 2023, supplied about 11%.1

Fig. 1South Dakota’s in-state generation, 2024

wind
~59%
hydropower
~21%
natural gas
~11%
all renewable sources
81%
Wind produced nearly three times as much electricity as hydropower in 2024. Shares of in-state net generation.1

The rest of the case is a cool climate, available land and a growing Sioux Falls metro. The harder questions are political and financial. South Dakota rejected tax incentives in 2026 and instead passed rules that put the cost of serving large loads on the data center.5 That is a different posture from North Dakota, which offers a sales tax exemption, and from Minnesota next door. For the regional market context, see our guides to SPP and MISO.

02Xcel, Black Hills, NorthWestern and the cooperatives

Who serves the parcel shapes everything else, so confirm the utility service territory first. In Sioux Falls, Xcel Energy owns the Split Rock substation and Angus Anson station next to the Gemini site.9 Black Hills Energy serves Rapid City and says it has capacity for a proposed 15 MW data center at the Black Hills Industrial Center.3 NorthWestern Energy serves other parts of the state.

Those two investor-owned utilities are combining. In June 2026 the South Dakota Public Utilities Commission unanimously approved the merger of Black Hills Energy and NorthWestern Energy into a company to be called Bright Horizon Energy, with about 2.1 million customers in eight states.11 The settlements keep the headquarters in Rapid City for at least 10 years and a corporate office in or near Sioux Falls for at least five, and delay rate increases.12 Large-load terms in both service areas may be revisited as the combined company sets policy.

Much of rural South Dakota is cooperative territory. East River Electric is a wholesale supplier to member distribution cooperatives in eastern South Dakota, and its spokesman has said the cooperative’s highest peak demand ever delivered is 864 MW, a size that took 75 years to reach.10 East River said it has been working with several companies on loads of 100, 200 or 430 MW.10 Service territory can itself be contested: Leola Data Center LLC petitioned the PUC to have Montana-Dakota Utilities assigned as its provider inside FEM Electric’s service area, and East River intervened.13

Fig. 2Proposed loads vs. one cooperative’s system peak

  • East River all-time peak864
  • Gemini, Sioux Falls (design)500
  • Applied Digital, Deuel Co.430
  • Leola (as of Dec. 2024)50
  • Sequitor Edge, Rapid City15

MW

Single campuses rival East River Electric’s all-time peak.10 Proposal figures are as reported in the text; several have changed since.

Our glossary entry on utility ownership types explains how cooperative, municipal and investor-owned systems differ, and the large-load interconnection process covers the studies a 100 MW-plus request will trigger.

03SB 135, the 2026 data center law

Governor Larry Rhoden signed Senate Bill 135, which supporters called the “Data Center Bill of Rights for Citizens,” in late March 2026.4 Its main provisions, as reported:

  • It applies to data centers with a peak electrical demand of 10 MW or more.4
  • Larger data centers must pay for any increase in electricity rates they cause rather than passing it to local customers, and must pay the electrical infrastructure costs attributable to them.54
  • Data center companies must ensure their water use does not overburden local resources.5
  • The state may not override local ordinances that limit, prohibit or otherwise regulate data centers.5

A second bill signed the same day lets the PUC assess data center companies for the cost of regulatory reviews of their projects.5 Bills to impose moratoriums failed, as did a bill to exempt large off-grid backup generators from PUC review.5 Read the enrolled text with counsel before relying on any summary, since the cost-allocation language is likely to be worked out in tariffs and contracts. The local-control clause matters for siting: a county or city that adopts restrictions will not be preempted by the state. See data center moratoriums and local restrictions and large-load tariffs and electric service agreements.

04Sales tax refunds and exemptions: proposed, not passed

South Dakota has debated data center sales tax relief for two sessions without enacting it. In 2025, Senate Bill 177 proposed a refund of sales and use taxes for a qualified business on enterprise IT equipment and software bought for a qualified data center’s initial build-out and refurbishment over 20 years.14 In 2026, House Bill 1005 would have exempted the same kind of equipment for 50 years after a qualifying date; the House State Affairs Committee voted 9–3 to kill it.7 Senate Bill 234, a narrower exemption for enterprise IT equipment and software in a qualified data center, was deferred in committee and is listed as dead.8

Fig. 3South Dakota’s 2026 session on data centers

March 2026

Signed into law

  • SB 135: costs on loads of 10 MW+
  • Water use must not overburden supplies
  • No state preemption of local rules
  • PUC may assess review costs

Did not pass

Failed

  • HB 1005: 50-year sales tax exemption
  • SB 234: IT equipment exemption
  • Moratorium bills
  • Backup generator exemption
What became law and what failed, as of October 2026.45

The effect showed up quickly. Applied Digital had planned a $5 billion, 430 MW campus near Toronto in Deuel County; in April 2026 a company vice president said the project “doesn’t make sense at this time” given the rejected incentives, and that the company would let its land agreement lapse.6 Projects in South Dakota should therefore be underwritten without a sales tax break on servers, which is a large cost item over a campus’s life. Our guides to sales tax exemptions by state and tax incentives vs. power costs show how much that gap can matter.

05Sioux Falls, Rapid City and local approvals

Sioux Falls is the test case for a hyperscale campus inside a city. On January 6, 2026, the city council voted 7–0 to rezone about 164 acres from agricultural to light industrial for Gemini Data Center SD LLC, and approved a preliminary plan after an amendment limiting the site’s water use.2 Gemini is a land developer working toward an as-yet unnamed end user; it bought the land from Xcel Energy in late 2023, next to the Split Rock substation, and the site is designed for up to 500 MW.9 The developer says it will pay for the electrical infrastructure needed to serve the site.9

Approval did not end the debate. A group called Let Sioux Falls Vote began collecting signatures to force a citywide vote on the rezoning.15 Anyone evaluating land near Sioux Falls should check whether a referral petition can be filed against a rezoning and how long that window lasts. See community engagement for data centers.

In western South Dakota, Sequitor Edge plans a 15 MW data center at the Black Hills Industrial Center in Rapid City, a size Black Hills Energy says it can serve.3 Smaller, edge-scale projects like this tend to move faster than gigawatt proposals because they fit within existing utility capacity.

06Water, drought and cooling design

Water now carries legal weight. SB 135 requires data centers to ensure their water use does not overburden local resources, and Sioux Falls wrote a water-use limit into its Gemini approval.52 Drought adds pressure: in mid-2026, fifty-three percent of South Dakota was in drought, with temperatures running six to ten degrees above normal and straining the regional grid.3

The practical response is to design for low water use from the start. South Dakota’s cool winters suit outside-air economization, and closed-loop or air-cooled systems reduce the volume a municipal provider has to commit. See closed-loop and waterless cooling and data center water requirements.

07How to screen a South Dakota site

  1. 01Identify the serving utility or cooperative, and whether territory could be contested at the PUC.13
  2. 02Size the load against SB 135’s 10 MW threshold and expect to pay for rate impacts and attributable infrastructure.4
  3. 03Ask the utility or cooperative how a load of your size compares with its system peak and what new generation it would need.10
  4. 04Confirm water supply with the local provider and plan for a water-use condition in local approvals.5
  5. 05Underwrite without a sales tax break on servers unless a future session changes the law.7
  6. 06Check local zoning, any county ordinance and the referral petition window for a rezoning.15

The site due diligence checklist and our methodology cover the rest. If you hold or are evaluating land in South Dakota, you can get a site reviewed.

CalculatorIT load to grid demand →CalculatorCooling water use →CalculatorLand for a load →

Common questions

Does South Dakota offer a data center sales tax refund?

Not as of October 2026. A 2025 refund bill did not become law,14 and 2026 exemption bills, including HB 1005 and SB 234, failed.78 The governor instead signed SB 135, which puts costs on large data centers rather than granting incentives.5

What does South Dakota’s SB 135 require of data centers?

It applies to data centers with peak demand of 10 MW or more, which must pay for rate increases and electrical infrastructure costs attributable to them and ensure their water use does not overburden local resources.45 It also bars the state from overriding local data center ordinances.5

Who provides power to data centers in South Dakota?

It depends on the parcel: Xcel Energy around Sioux Falls,9 Black Hills Energy around Rapid City,3 NorthWestern Energy in parts of the state, and cooperatives supplied by wholesale cooperatives such as East River Electric elsewhere.10 Black Hills and NorthWestern received South Dakota approval to merge in June 2026.11

What happened to the Sioux Falls data center?

The city council rezoned about 164 acres for Gemini Data Center SD LLC in January 2026, with a water-use limit, and the site is designed for up to 500 MW.29 A citizen group then sought a public vote on the rezoning, so check the current status locally.15

Is South Dakota’s power mostly renewable?

Yes. Renewables produced about 81% of in-state generation in 2024, led by wind at about 59% and hydropower at about 21%.1 A large new load will still need firm supply and transmission arranged through its utility.

Notes

  1. 1.U.S. Energy Information Administration, “South Dakota State Profile and Energy Estimates: Profile Analysis,” 2025. eia.gov
  2. 2.Dakota News Now, “SF City Council approves measure to develop data center,” 2026. dakotanewsnow.com
  3. 3.KOTA Territory News, “South Dakota drought strains power grid as Rapid City data center moves forward,” 2026. kotatv.com
  4. 4.South Dakota Public Broadcasting, “Rhoden signs “Data Center Bill of Rights” bill,” 2026. sdpb.org
  5. 5.KOTA Territory News, “Data center restrictions signed into South Dakota law after push for incentives failed,” 2026. kotatv.com
  6. 6.South Dakota Searchlight, “One data center project unchanged while another ‘doesn’t make sense’ after rejected incentives,” 2026. southdakotasearchlight.com
  7. 7.South Dakota Searchlight, “Data center tax break proposal fails in South Dakota legislative committee,” 2026. southdakotasearchlight.com
  8. 8.LegiScan, “SD SB234, 2026 Regular Session,” 2026. legiscan.com
  9. 9.Sioux Falls Simplified, “Why councilors voted to pave the way for a hyperscale data center,” 2026. sfsimplified.com
  10. 10.South Dakota Searchlight, “Massive data centers consuming large amounts of energy have eyes on South Dakota,” 2024. southdakotasearchlight.com
  11. 11.Dakota News Now, “Merger of NorthWestern Energy and Black Hills Energy approved by the PUC,” 2026. dakotanewsnow.com
  12. 12.South Dakota Public Broadcasting, “PUC approves Black Hills Energy, NorthWestern Energy merger,” 2026. sdpb.org
  13. 13.South Dakota Public Utilities Commission, “East River Electric Power Cooperative petition to intervene, Docket EL24-027,” 2024. puc.sd.gov
  14. 14.South Dakota Legislature, “Senate Bill 177 (100th Legislative Session, 2025), amended text,” 2025. mylrc.sdlegislature.gov
  15. 15.SiouxFallsLive, “Sioux Falls group wants citywide vote on data center rezone,” 2026. siouxfallslive.com

Have a site in mind?

Get a straight answer on your land.

Send a parcel number, an address, a map pin or a target load. We’ll tell you what it can support and what it would take.

Start a conversation →

This guide is general information about data center site selection. It is not engineering, legal, tax or investment advice. Requirements vary by state, utility and county, so confirm the specifics for any site with the relevant authorities and advisors.

Terms in this guide

Neighboring states

Related guides

More in Site selection by state

Guide 31 of 39 in Site selection by state · all 242 guides · glossary · calculators