Data center site selection guides
240 sourced guides on what decides whether land can hold a data center. Search, follow a short reading path, or pick your state.
01Start with what you're trying to do
Seven guides, in the order we'd read them.
Reading path7 guides · about 65 min
- 01Can My Land Host a Data Center? A Landowner’s Guide9 min
- 02What Is Powered Land?9 min
- 03How Much Land Does a Data Center Need?9 min
- 04What Drives Data Center Land Value? Power, Timing, Entitlements and Size8 min
- 05Buy, Option or Lease: How Developers Secure Data Center Land9 min
- 06Data Center Land Option Agreements: Key Terms for Landowners9 min
- 07Agricultural Tax Status and Rollback Taxes When Farmland Is Developed10 min
Reading path7 guides · about 70 min
- 01Data Center Site Selection Criteria: The Complete Checklist9 min
- 02How Much Power Does a Data Center Need?10 min
- 03Substation Proximity and Capacity for Data Center Sites11 min
- 04How the Large-Load Utility Interconnection Process Works10 min
- 05Data Center Water Requirements and Cooling Choices11 min
- 06Zoning for Data Centers: By-Right, Special Use and Rezoning11 min
- 07Why Data Center Sites Fail: Common Red Flags10 min
Reading path7 guides · about 65 min
- 01Data Center Site Due Diligence Checklist9 min
- 02Utility Will-Serve Letters: What They Mean and What They Don’t8 min
- 03Phase I Environmental Site Assessments for Data Center Land10 min
- 04Can You Build a Data Center in a Floodplain?10 min
- 05Wetlands and Data Center Development: Delineation, Permits and Buildable Land9 min
- 06Title Review and ALTA Surveys for Data Center Land9 min
- 07How to Read a Data Center Feasibility Report8 min
Reading path7 guides · about 65 min
- 01What Are the Site Requirements for an AI Data Center?9 min
- 02What Does a Gigawatt-Scale AI Data Center Campus Require?9 min
- 03High-Density GPU Racks: What 120 kW+ Racks Ask of a Data Center Site8 min
- 04Grid Power vs. On-Site Generation: How to Decide11 min
- 05Power Timelines: Why “When” Matters as Much as “Where”9 min
- 06Air vs. Liquid Cooling: What Each Needs From a Site9 min
- 07Data Center Campus Master Planning: Pads, Substation, Roads and Phasing9 min
Reading path7 guides · about 55 min
- 01How Developers Underwrite Data Center Sites8 min
- 02How Data Center Deals Are Structured: Shells, Build-to-Suits, Leases and JVs9 min
- 03Who Finances Data Centers? REITs, Private Equity, Infrastructure Funds and Debt8 min
- 04Major U.S. Data Center Markets: Inventory, Absorption and Power8 min
- 05Data Center Vacancy, Absorption and Pricing Trends in North America8 min
- 06U.S. Data Center Electricity Demand Forecasts: LBNL, EPRI and Grid Operators9 min
- 07Data Center Construction Costs per MW and the Site Factors That Drive Them7 min
Reading path7 guides · about 70 min
- 01A Data Center Is Proposed Near You: What to Know and What to Ask8 min
- 02Public Hearings for Data Center Projects: Notice, Testimony and How to Prepare9 min
- 03Noise, Setbacks and Buffers for Data Centers11 min
- 04Data Center Water Requirements and Cooling Choices11 min
- 05Do Data Centers Raise Electricity Bills? Cost Shifting, Large-Load Tariffs and the Studies9 min
- 06The Economic Impact of Data Centers on Communities: Taxes, Jobs and the Evidence10 min
- 07Data Center Moratoriums and Local Restrictions: How to Screen for Them10 min
02Or start with a state
39 state guides, plus regional guides for California and New England.
03Or browse every guide
All 240, by topic.
Power & interconnection
35 guides- How Much Power Does a Data Center Need?
- Transmission Voltage and Data Centers: 69 kV to 765 kV
- Substation Proximity and Capacity for Data Center Sites
- How the Large-Load Utility Interconnection Process Works
- Power Timelines: Why “When” Matters as Much as “Where”
- ISOs, RTOs and Utility Territories in Data Center Siting
- On-Site Generation and Bridge Power for Data Centers
- What Is Powered Land?
- Load Ramp Schedules: How to Phase Power for a Data Center Campus
- Redundant Utility Feeds and Dual Substations for Data Centers
- Large-Load Tariffs and Electric Service Agreements, Explained
- Behind-the-Meter vs. Front-of-the-Meter Power for Data Centers
- Transmission Upgrades for Data Centers: Who Pays for Them?
- Microgrids and Battery Storage at Data Center Sites
- Co-Locating Data Centers With Power Plants
- Nuclear and Small Modular Reactors: Siting Considerations for Data Centers
- Renewable Energy Procurement and How It Affects Data Center Siting
- What Is a Utility Load Study for a Data Center?
- Firm vs. Interruptible Electric Service for Data Centers
- Flexible Data Center Loads and Demand Response
- Texas Senate Bill 6: What It Means for Data Centers and Large Loads
- PJM Capacity Prices and Data Center Load Growth
- Contribution in Aid of Construction (CIAC) and Line Extensions for Data Centers
- Transformer and Switchgear Lead Times for Data Centers
- Substation Configurations for Data Center Campuses: Ring Bus, Breaker-and-a-Half and Double Bus
- Electricity Rates and Power Costs for Data Center Sites
- Power Purchase Agreements for Data Centers: Physical, Virtual and Sleeved
- 24/7 Carbon-Free Energy and Hourly Matching for Data Centers
- Gas Turbines vs. Reciprocating Engines for Data Center On-Site Power
- Fuel Cells for Data Center Power: How They Work and Where They Fit
- NERC Reliability Standards and Large Data Center Loads: Ride-Through, Load Loss and Registration
- From Signed Agreement to Energization: The Data Center Power Timeline
- Hydropower and Data Center Siting: Public Power, Allocations and Drought Risk
- Geothermal Power for Data Centers: Enhanced Geothermal, Clean Tariffs and Siting in the West
- Surplus Interconnection Service and Retired Power Plant Sites: How Existing Grid Rights Get Reused
Land & site fundamentals
23 guides- How Much Land Does a Data Center Need?
- Data Center Site Selection Criteria: The Complete Checklist
- Parcel Assembly for Data Center Campuses
- Gross vs. Buildable Acreage: How Much of a Site You Can Use
- Site Shape, Access and Frontage for Data Centers
- Can My Land Host a Data Center? A Landowner’s Guide
- Greenfield vs. Brownfield Data Center Sites: Which Is Better?
- Can a Retired Power Plant or Industrial Site Become a Data Center?
- Mineral Rights and Easements: How They Affect Data Center Land
- Title Review and ALTA Surveys for Data Center Land
- Can Farmland Be Converted to a Data Center?
- Data Center Land Option Agreements: Key Terms for Landowners
- Ground Leases for Data Centers: Terms, Rent, Financing and Reversion
- What Drives Data Center Land Value? Power, Timing, Entitlements and Size
- Topographic Surveys and LiDAR for Data Center Site Selection
- Heavy-Haul Routes and Construction Access for Data Centers
- Certified Sites and Shovel-Ready Programs: What They Mean for Data Centers
- Eminent Domain and Transmission Line Easements: A Landowner’s Guide
- How Data Centers Are Taxed: Property Taxes, Abatements and PILOTs
- Federal Land for AI Data Centers: DOE Sites, BLM and Military Bases
- Conservation Easements and Deed Restrictions on Data Center Land
- Subdivision, Platting and Lot Consolidation for Data Center Sites
- Agricultural Tax Status and Rollback Taxes When Farmland Is Developed
Water, gas & fiber
18 guides- Data Center Water Requirements and Cooling Choices
- Natural Gas Pipeline Access for Data Center Sites
- Fiber Connectivity for Data Center Sites
- Climate, Cooling and Data Center Site Selection
- Reclaimed Water for Data Center Cooling
- Air vs. Liquid Cooling: What Each Needs From a Site
- Dark Fiber vs. Lit Services: Which Does a Data Center Site Need?
- How Long-Haul and Subsea Fiber Routes Affect Data Center Site Selection
- Water Rights and Groundwater Permits for Data Centers
- Wastewater and Cooling Water Discharge for Data Centers
- Water Stress and Drought Risk in Data Center Siting
- Closed-Loop and Waterless Data Center Cooling: What It Means for a Site
- Fiber Route Diversity and Latency for Data Center Sites
- Internet Exchange Points and Carrier Hotels: Why They Shape Data Center Markets
- Latency Requirements by Workload: Where Data Center Proximity Matters
- Firm Natural Gas Transportation for Data Center On-Site Power
- Municipal Water and Sewer Capacity for Data Center Sites: Treatment Plants, Extensions and Will-Serve Letters
- Data Center Heat Reuse and District Heating: EU Rules, Nordic Examples and U.S. Site Implications
Environmental & physical risk
21 guides- Can You Build a Data Center in a Floodplain?
- Wetlands and Data Center Development: Delineation, Permits and Buildable Land
- Slope, Soils and Geotechnical Review for Data Center Sites
- Natural Hazard Risk in Data Center Site Selection
- Phase I Environmental Site Assessments for Data Center Land
- Endangered Species Review for Data Center Sites: What Triggers It and What to Check
- Cultural Resources and Section 106: What Data Center Developers Need to Know
- Stormwater Management for Data Center Campuses: Permits, Ponds and Land Use
- Do Data Center Backup Generators Need an Air Permit?
- NEPA Review for Data Centers: When It Applies and What Changed in 2025
- Seismic Risk and Data Center Site Selection: Hazard Maps, Design Categories and Liquefaction
- Karst, Sinkholes and Data Center Sites: How to Screen and Investigate the Ground
- Tornado and High-Wind Risk for Data Centers: ASCE 7-22 Tornado Loads, Risk Categories and Siting
- Wildfire Risk and Data Center Siting: Hazard Maps, Power Shutoffs and WUI Codes
- Hurricane and Storm Surge Risk for Data Center Sites: SLOSH Maps, Coastal Flood Zones and Grid Outages
- Brownfield Cleanup Programs and Liability Protections for Data Center Sites
- Phase II Environmental Site Assessments for Data Center Land: When You Need One and What It Costs
- Tree Clearing and Forest Conservation Rules for Data Center Sites
- Climate Change, Future Heat and Data Center Site Risk
- Data Center Emissions and ESG Reporting: What It Means for Site Selection
- Diesel Fuel Storage and SPCC Plans at Data Centers
Zoning, permitting & community
20 guides- FAA Airspace, Airports and Height Limits for Data Centers
- Zoning for Data Centers: By-Right, Special Use and Rezoning
- The Data Center Permitting Process, Step by Step
- Community Engagement and Local Concerns About Data Centers
- Data Center Tax Incentives: What to Look For
- Noise, Setbacks and Buffers for Data Centers
- Development Agreements for Data Center Projects: What They Cover
- Annexation, Jurisdiction and Utility Service Areas for Data Center Sites
- Data Center Moratoriums and Local Restrictions: How to Screen for Them
- Site Plan Review for Data Centers: What It Covers and How Long It Takes
- Building and Fire Codes for Data Centers: IBC, NFPA 75 and 76, NFPA 855
- Data Center Sales Tax Exemptions by State: Thresholds, Pauses and Repeals (2026)
- Public Hearings for Data Center Projects: Notice, Testimony and How to Prepare
- Comprehensive Plans and Future Land Use Maps for Data Center Sites
- Data Center Zoning Ordinances and Overlay Districts: Recent Rules and Standards
- Traffic Impact Studies for Data Centers: Trip Generation, Construction Traffic and Road Improvements
- Impact Fees and Utility Connection Fees for Data Centers: How They Work and What Is Negotiable
- Contested Data Center Projects: Lessons From Prince William, Peculiar, Tucson and Other Public Fights
- State Data Center Legislation: 2025–2026 Trends in Tariffs, Incentives, Water and Moratoriums
- Data Center Architectural and Visual Standards: Facades, Screening, Lighting and Height
Feasibility, diligence & deals
18 guides- What Does a Data Center Feasibility Study Cover?
- Data Center Site Due Diligence Checklist
- Why Data Center Sites Fail: Common Red Flags
- How to Screen a Land Portfolio for Data Center Potential
- Selling or Leasing Land to a Data Center Developer
- How Long Does Data Center Site Selection Take?
- Desktop Screening vs. Field Assessment for Data Center Sites
- How to Read a Data Center Feasibility Report
- Site Scoring and Weighting Methods for Data Center Selection
- GIS Data Sources for Data Center Site Selection: What Each Layer Shows
- Letters of Intent for Data Center Land Deals: Binding Terms, Exclusivity and Pitfalls
- Utility Will-Serve Letters: What They Mean and What They Don’t
- How Developers Underwrite Data Center Sites
- Data Center Construction Costs per MW and the Site Factors That Drive Them
- Due Diligence Periods and Purchase Contingencies for Data Center Land
- Confidentiality, NDAs and Code Names in Data Center Site Searches
- What to Check on a Data Center Site Visit: A Field Checklist
- Public Data Sources for Power Capacity: EIA, FERC, OASIS, Queues and Hosting Maps
Site strategy by data center type
11 guides- Site Needs by Data Center Type: Edge, Colocation and Hyperscale
- What Are the Site Requirements for an AI Data Center?
- AI Training vs. Inference Data Centers: How Site Needs Differ
- Edge Data Center Site Selection: Location, Power and Zoning
- Colocation Data Center Site Selection: Markets, Connectivity and Multi-Tenant Needs
- Converting Bitcoin Mining Sites to AI Data Centers: Power Advantage and Gaps
- Modular and Prefabricated Data Centers: Speed, Footprint and Permitting
- What Does a Gigawatt-Scale AI Data Center Campus Require?
- High-Density GPU Racks: What 120 kW+ Racks Ask of a Data Center Site
- Government, Defense and Sovereign Data Center Siting: Security, Federal Rules and Data Residency
- Enterprise Data Center Site Selection: Distance From HQ, DR Separation and Hybrid Cloud
Campus design & construction
11 guides- Data Center Campus Master Planning: Pads, Substation, Roads and Phasing
- Data Center Tier Levels Explained: Uptime Tiers, TIA-942 Ratings and Redundancy
- PUE Explained: Data Center Power Usage Effectiveness, Averages and Climate
- Data Center Building Footprint, Lot Coverage and Floor Area: How Much Fits on a Site
- Data Center Backup Generators: How Many, What Size, and How Much Fuel
- Water Usage Effectiveness (WUE): How Data Center Water Use Is Measured
- UPS and Electrical Distribution in Data Centers: Medium Voltage, UPS Types and Redundancy
- How Long Does It Take to Build a Data Center? Design, Permitting and Construction Phases
- Data Center Physical Security and Perimeter Design: Setbacks, Fencing and Crash-Rated Barriers
- Data Center Cooling Plant and Equipment Yard Space: Chillers, Dry Coolers and Cooling Towers
- Data Center Rack Density Trends: Average kW per Rack From 2011 to AI Racks
Markets & economics
11 guides- Major U.S. Data Center Markets: Inventory, Absorption and Power
- Emerging Data Center Markets in the U.S.: Where Growth Is Moving and Why
- U.S. Data Center Electricity Demand Forecasts: LBNL, EPRI and Grid Operators
- Data Center Vacancy, Absorption and Pricing Trends in North America
- The Northern Virginia Data Center Market: History, Power Limits and Land Prices
- How Data Center Deals Are Structured: Shells, Build-to-Suits, Leases and JVs
- Who Finances Data Centers? REITs, Private Equity, Infrastructure Funds and Debt
- The Economic Impact of Data Centers on Communities: Taxes, Jobs and the Evidence
- Do Data Centers Raise Electricity Bills? Cost Shifting, Large-Load Tariffs and the Studies
- Data Center Equipment Supply Chain Constraints: Turbines, Transformers, Chillers and Chips
- How Hyperscalers Choose Data Center Sites: Power First
Decisions and trade-offs
12 guides- Buy, Option or Lease: How Developers Secure Data Center Land
- Phased vs. Full Build-Out: How to Stage a Data Center Campus
- New Site or Expand an Existing Campus? How to Decide
- Grid Power vs. On-Site Generation: How to Decide
- One Large Data Center Campus vs. Several Smaller Sites
- Near the Metro or Near the Power? Choosing a Data Center Location
- Build, Lease or Colocate? How to Source Data Center Capacity
- Regulated Utility vs. Competitive Market Sites for Data Centers
- Rural vs. Suburban Data Center Sites: Land, Power, Labor and Local Politics
- Tax Incentives vs. Power Costs: Which Matters More for a Data Center Site?
- Utility-Owned vs. Customer-Owned Substations for Data Centers
- Converting a Warehouse or Factory to a Data Center vs. Building New
Grid regions
9 guides- Data Center Site Selection in PJM
- Data Center Site Selection in ERCOT (Texas)
- Data Center Site Selection in MISO
- Data Center Site Selection in SPP
- Data Center Site Selection in the Southeast
- Data Center Site Selection in California and CAISO
- Data Center Site Selection in the Pacific Northwest
- Data Center Site Selection in the Mountain West and Desert Southwest
- Data Center Site Selection in New York and New England
Site selection by state
39 guides- Data Center Site Selection in Alabama
- Data Center Site Selection in Arizona: APS, SRP, TEP, Water and Heat
- Data Center Site Selection in Arkansas: Entergy, SWEPCO, 2025 Laws and Local Rules
- Data Center Site Selection in Colorado: Xcel’s Large-Load Tariff, Water and Local Rules
- Data Center Site Selection in Florida
- Data Center Site Selection in Georgia: Georgia Power, PSC Rules, Water and Taxes
- Data Center Site Selection in Idaho
- Data Center Site Selection in Illinois: ComEd, Ameren, PJM vs. MISO and the Incentive Pause
- Data Center Site Selection in Indiana
- Data Center Site Selection in Iowa
- Data Center Site Selection in Kansas
- Data Center Site Selection in Kentucky
- Data Center Site Selection in Louisiana
- Data Center Site Selection in Maryland
- Data Center Site Selection in Michigan: DTE, Consumers, Tax Rules and Water
- Data Center Site Selection in Minnesota
- Data Center Site Selection in Mississippi
- Data Center Site Selection in Missouri
- Data Center Site Selection in Montana
- Data Center Site Selection in Nebraska
- Data Center Site Selection in Nevada: NV Energy, Reno and Las Vegas, Water Rules and GOED Abatements
- Data Center Site Selection in New Mexico
- Data Center Site Selection in New York: NYISO, Hydropower and the 2026 Permit Pause
- Data Center Site Selection in North Carolina
- Data Center Site Selection in North Dakota
- Data Center Site Selection in Ohio: AEP Ohio’s Tariff, PJM Costs and the Tax Pause
- Data Center Site Selection in Oklahoma
- Data Center Site Selection in Oregon
- Data Center Site Selection in Pennsylvania
- Data Center Site Selection in South Carolina
- Data Center Site Selection in South Dakota
- Data Center Site Selection in Tennessee
- Data Center Site Selection in Texas: Grids, SB 6, Water and Incentives
- Data Center Site Selection in Utah
- Data Center Site Selection in Virginia: Power, GS-5, Zoning and Tax Rules
- Data Center Site Selection in Washington State
- Data Center Site Selection in West Virginia
- Data Center Site Selection in Wisconsin
- Data Center Site Selection in Wyoming
Guides by role
12 guides- A Landowner’s Path: From First Question to Signed Deal
- Site Selection for Data Center Developers: What to Answer, in Order
- Site Risk for Data Center Investors and Lenders
- Representing Land for Data Center Use: A Broker’s Guide
- Attracting Data Centers: A Guide for Economic Development Organizations
- Large Data Center Loads: What Utilities and Co-ops Look For
- Data Centers: A Guide for County Officials and Planners
- Data Center Interest in Farm and Ranch Land: A Guide for Farmers
- Family Land, Estates and Trusts: How to Handle a Data Center Offer
- Pairing Power Projects With Data Centers: A Guide for Energy Developers
- Data Center Site Selection for Corporate Real Estate Teams
- A Data Center Is Proposed Near You: What to Know and What to Ask
Also useful: the glossary, planning calculators and how we screen sites.
